A Reversepowerplant is located in South Tyrol

Construction of the CW1800x2-1000 backwards power plant in Lasa began in April 2018. The plant was completed and ready for operation just five months later. Since then, the power plant has been successfully serving the district heating network of the Laaser-Eyrser Energie Genossenschaft (LEEG). The special task was to replace an existing gasification system and integrate the new system into the existing biomass cogeneration plant and the existing heating network. As the building in which the power plant was to be located had already been built, the small installation area posed a challenge that had to be overcome.

  • CustomerFERNHEIZWERK LAAS
  • System TypeCW1800x2-1000
  • Electrical power 1,000 kW
  • CO₂ avoided1)7,000 t/a
  • CO₂ extracted2)3,000 t/a
  • Heat utilizationDistrict heating network
  • Fuel requirement724 kg/h
  • Area600 m²
  • Commissioning2018
  • 1) compared to natural gas
  • 2) permanently extracted via green coal

Together with the operator, it was possible to operate the Jenbacher 420 engine-type combined heat and power plant with maximum availability and efficiency. The Reversepowerplant in Laas is SYNCRAFT's first dual plant at one location and has an electrical output of 1,000 kW. The automation and switch cabinet construction were realized by the subsidiary SYNCRAFT Automation GmbH.